A focused group

Experience counts

Slave Lake

These properties were acquired on October 30, 2015.

Approximately 90% of the production is in all season access areas with the main asset being the Mitsue Gilwood Sand Units.

Key Operating Facts

  • Large OOIP, current estimates between 800 million and 1 billion barrels in place
  • Opportunity to significantly expand the reserves and recovery factors
  • Consolidation opportunities
  • 4 initial concepts for growth:
    • Reactivations
    • Overall volume increase
    • Water flood optimization
    • Horizontal multi stage frac drills

Slave Lake Map